The original centre-hung scoreclock was replaced during the 1985 renovations (this renovation work included seismic upgrades to the facility) by a new four-sided centre-hung scoreclock with colour matrix animation/matrix displays along with electronic message boards across the bottom on each side (the original sponsors for this clock were Imperial Tobacco and Molson Brewery), which in 2007 was replaced by a four-sided Daktronics scoreboard with a video display on each side.
Recent renovations were completed in 2007 to upgrade accessibility, seating, HVAC, and ice surface for its use as a venue for the 2010 Winter Olympics. During the renovations prior to the Olympics major upgrades were done to the ice plant at Pacific Coliseum. The adjacent Agrodome ice plant was decommissioned and both buildings now share the same system located at the Coliseum.
🏟️